成果範例 Process review: order-to-delivery at a custom furniture workshop Current process map (order intake → production)
Customer sends an inquiry via website form, phone or Instagram DM
Owner (Dan) replies personally, often 1–3 days later
Dan measures on site, sketches by hand, photographs the sketch
Quote typed in a Word template, emailed as PDF
Customer pays 50% deposit by bank transfer; Dan checks the bank app manually
Sketch and notes handed to the shop lead on paper
Shop lead orders wood by phone; adds job to the whiteboard
Bottlenecks and losses
Problem Where Impact All inquiries go through one person Steps 1–2 ~20% of inquiries never get a reply; slow first response Paper handoff to the shop Step 6 3 rework cases last quarter due to lost or misread dimensions Deposit checked by hand Step 5 Jobs start late; once a job started without a deposit Whiteboard is the only schedule Step 7 Delivery dates promised without seeing the load
Improved process
All channels lead to one shared inbox ; office manager replies within 4 working hours with a booking link for measurement
Measurements entered into a job card (shared spreadsheet or simple CRM): dimensions, wood, finish, photos
Quote generated from a price sheet with standard options; Dan approves only non-standard items
Office manager confirms the deposit and marks the job card "Ready for production"
Shop lead takes jobs only from the "Ready" column; materials ordered from the card
Delivery date given only after the job is placed on the shared schedule
Simple metrics to track
First response time — target: under 4 working hours
Inquiry → paid deposit conversion — current estimate 25%, target 35%
Rework cases per month — target: 0–1
On-time delivery — target: 90%
Step-by-step plan
Week 1: set up a shared inbox and a job card template
Week 2: build a price sheet with the 12 most common options
Week 3: move the whiteboard to a shared schedule; train the shop lead
Week 4: review the first 10 orders against the new metrics
Client: Oak & Pine Studio, a 9-person workshop making custom tables and shelving. Processes reviewed: order intake, production scheduling, delivery and installation.
客戶與所有細節皆為虛構。
關於此服務 小型營造公司的利潤往往流失在辦公室與工地之間的縫隙:每次估價都從頭做起、材料太晚訂購、前一個工種還沒完工,下一批工班就進場,口頭同意的變更從來沒有請款。我們描繪一項工程從詢問與現場勘查,經過估價、合約、工班與分包商排程、材料訂購、變更單與驗收,一直到交付與最終請款。您會得到更清楚的工程流程、變更單規則、交付檢核表,以及估價回覆時間與準時完工案件數等數字。
服務流程 1 需求說明 您描述一般工程如何進行
2 檢視 我們追蹤工程,找出缺口
3 計畫 您取得新工作流程與規則
需要您提供的資料 您承接的工程類型與一般規模、由誰估價、排程、採購材料與督導工地、您合作的分包商、變更如何協議、您使用的工具,以及排程或估價範本的照片或截圖。
我們會詢問您:
您承接哪類工程? 誰負責準備估價?需要多久? 工地的變更如何與客戶協議? 工程最常在哪裡延誤? 比較方案 方案 基本版 US$19 標準版 US$39 進階版 US$79 包含內容 單一工程階段 最多 3 個階段 從詢問到最終請款,90 天計畫 交付期限 1 天 2 天 4 天 修改次數 1 2 3 流程數 1 最多 3 個 最多 6 個 追蹤指標 最多 3 項 最多 6 項 最多 10 項 改善計畫 逐步執行 逐步執行 90 天,逐週安排 訂購 基本版 訂購 標準版 訂購 進階版
付款保障 下單時付款,但只有在驗收成果後,款項才會撥付。
固定價格 付款後,方案價格不會變動。
款項先行保留 付款時,金額只會先保留,在您驗收後才會撥付給服務。
交付前檢查 每份成果在交到您手上之前都會經過品質檢查,您也可以在驗收前於訂單頁面查看成果。
免費修改 在需求說明範圍內,可依方案允許的次數提出修改。
3 天後自動驗收 若您在交付後 3 天內未驗收也未提出修改,成果將自動驗收。若您在交付後於訂單聊天室留言,訂單會暫停自動驗收;我們回覆後,可能會重新起算 3 天,並會在聊天室中告知。
重新製作或全額退款 若成果不符合您的需求說明且修改後仍未改善,或製作時間超過交付期限的兩倍,請在訂單聊天室留言:我們將重新製作,或全額退還款項。
運作方式 → 常見問題 你們會檢查我們的估價或價格嗎? 不會。我們檢視的是估價如何製作與傳遞,而非數量或單價。
這涵蓋工地安全或建築法規嗎? 不涵蓋。安全規定、許可與法規因國家而異,仍須依您的法規辦理。
你們可以推薦專案軟體嗎? 我們會說明工具需要為您的工作流程做到什麼。選擇與設定仍由您決定。
沒有找到您要的答案? 詢問我們