主機搬遷檢查清單網域與主機教學

不中斷服務、將網站搬到新主機的檢查清單

通常 15 分鐘內完成含修改次數品質檢查
方案
付款保障詳細資訊
  • 方案內的修改免費。
  • 若您在交付後 3 天內未回應,成果將自動驗收。

付款時款項會先保留,在您驗收後才會撥付。

不中斷服務、將網站搬到新主機的檢查清單

成果範例

標準版方案範例

SOP set: opening and closing procedures for a small café

SOP-02: Closing the café

PurposeLeave the café clean, safe and ready for the morning shift
WhoThe closing barista; the shift lead signs off
WhenStart at 5:30 pm, doors locked at 6:00 pm, finished by 6:45 pm
You needClosing checklist sheet, till key, cleaning caddy, blue cloths

Before you start

Warning: Never switch off the main power at the wall. The fridges and the alarm run on the same board.

Steps

  1. At 5:30 pm, turn the door sign to "Last orders". Customers already inside can stay until 6:00.
  2. Switch the coffee machine to rinse mode. Press and hold the cup button for 5 seconds. You should see: "RINSE" flashing on the display and hot water running through both group heads for about 2 minutes.
  3. Take out the portafilters and soak them in the black container with one cleaning tablet. Leave them for 20 minutes.
  4. Move cakes and sandwiches to the back fridge. Label anything opened today with today's date and "Use by tomorrow".
  5. Record the fridge temperatures on the log sheet. You should see: between 1 °C and 5 °C. If a fridge shows above 5 °C, go to step 12 first.
  6. At 6:00 pm, lock the front door and turn the sign to "Closed".
  7. Close the till. Press MENU, then "End of day", then "Z report". You should see: the report printing with today's total. Do not count the cash at the counter; take the drawer to the office.

(Steps 8–14: floors, bins, alarm and handover note.)

If something goes wrong

ProblemWhat to do
Fridge above 5 °CMove food to the second fridge, note the time and temperature, message the shift lead
Z report does not printReplace the paper roll; if it still fails, write the total from the screen and photograph it
Alarm will not setCheck the back door is fully shut; the alarm will not arm with it open

Sign-off

Closing barista: name, time. Shift lead: initials.

Last reviewed: [date]. Review again when the coffee machine or till is replaced.

Client: Bluebell Café, 22 seats, 7 staff working in rotating shifts Input: the owner's voice notes, a handwritten checklist and 9 photos of the counter, coffee machine and till screen Delivered: a set of 6 SOPs (4,600 words): opening, closing, cash handling, fridge temperature log, deep-cleaning the coffee machine, handling a customer complaint. Below: an excerpt of the closing procedure.

客戶與所有細節皆為虛構。

關於此服務

網站搬到新主機時,總是以可預期的方式出錯:忘了資料庫、更換名稱伺服器後電子郵件中斷、SSL 憑證失效,或是 DNS 切換得太早而造成整個週末停擺。我們針對您的網站類型與兩家主機撰寫書面搬遷檢查清單:要盤點與備份什麼、如何複製檔案與資料庫、切換前如何在新伺服器上測試、何時調低 DNS TTL、切換本身,以及回復計畫。您或您的開發人員依序勾選每個步驟。

包含內容

  • 您會收到書面搬遷檢查清單,依階段從盤點到回復,含針對您主機的指令或控制台步驟、切換時程表與搬遷後測試清單,訂單頁面上提供,並附 Word (.docx) 或 PDF 檔案。
  • 盤點檔案、資料庫、電子郵件、排程工作與憑證
  • 切換前測試在新伺服器上預覽網站
  • DNS 時機提前調低 TTL,在低流量時段切換
  • 回復計畫萬一出問題,如何快速回復
  • 書面指南不含通話或即時教學

服務流程

  1. 1
    需求說明您告知兩家主機與網站架構
  2. 2
    檢查清單我們撰寫階段與步驟
  3. 3
    搬遷由您或您的開發人員執行

需要您提供的資料

您目前與新的主機、網站類型(例如 WordPress、線上商店或自訂應用程式)、帳號上的網域、電子郵件與其他服務、兩邊控制台的截圖(隱藏個資),以及流量最低的時段。

我們會詢問您:

  • 您要離開哪家主機?要搬到哪裡?
  • 是哪一類網站?
  • 電子郵件也託管在同一個帳號上嗎?
  • 由誰負責搬遷:您還是開發人員?

比較方案

方案基本版單一簡易網站的檢查清單US$15標準版含資料庫與電子郵件的網站US$29進階版多個網站或 VPS 搬遷US$55
交付期限1 天3 天5 天
修改次數123
篇幅最多 1,500 字最多 4,000 字最多 8,000 字
涵蓋的網站11最多 5
電子郵件搬遷否是是
訂購 基本版訂購 標準版訂購 進階版

付款保障

下單時付款,但只有在驗收成果後,款項才會撥付。

  • 固定價格付款後,方案價格不會變動。
  • 款項先行保留付款時,金額只會先保留,在您驗收後才會撥付給服務。
  • 交付前檢查每份成果在交到您手上之前都會經過品質檢查,您也可以在驗收前於訂單頁面查看成果。
  • 免費修改在需求說明範圍內,可依方案允許的次數提出修改。
  • 3 天後自動驗收若您在交付後 3 天內未驗收也未提出修改,成果將自動驗收。若您在交付後於訂單聊天室留言,訂單會暫停自動驗收;我們回覆後,可能會重新起算 3 天,並會在聊天室中告知。
  • 重新製作或全額退款若成果不符合您的需求說明且修改後仍未改善,或製作時間超過交付期限的兩倍,請在訂單聊天室留言:我們將重新製作,或全額退還款項。
運作方式 →

常見問題

可以幫我搬遷網站嗎?

不行。我們絕不會登入您的主機。檢查清單的詳細程度,足以讓您或開發人員照著操作。

搬遷真的可以不中斷服務嗎?

對多數網站來說可以,只要先測試並提前調低 TTL。有即時訂單的商店需要短暫凍結,檢查清單中已納入規劃。

我的 SEO 會受影響嗎?

如果網域與網址維持不變,排名通常不受影響。檢查清單包含搬遷後對轉址與 robots.txt 的檢查;我們不保證排名。

沒有找到您要的答案?

方案